Murray Drive, City of Farmington

The City of Farmington contracted with Cheney-Walters-Echols, Inc. to design improvements to L.E. Murray and the "Old Bloomfield Highway." These two projects murrayinvolved extensive relocations, major drainage structures and right-of-way acquisition. The total cost was approximately $8,000,000

Cheney-Walters-Echols, Inc. received a "National Quality Initiative" award from the Federal Highway Administration for this project.


Browning Parkway, City of Farmington

The City of Farmington contracted with Cheney-Walters-Echols, Inc. to select right-of-way for a connection between East Main Street and U.S. Highway 64.
browningTwo alternate routes for the project were reviewed and the city selected the current route that has been obtained, designed and constructed. During the archeological study, a Chaco Road was discovered. The site had to be mitigated proior to construction.


Jicarilla Apache Tribe Water Treatment Facility, Dulce, New Mexico

This $1,500,00 gallon per day capacity plant was designed and constructed for the Jicarilla Apache Tribe. It replaced an older 1,000,000 gallon per day plant that was difficult to operate and maintain.

dulce